Master Plan Projects

City Campus Master Plan

The City Campus Master Plan comprises a number of distinct projects, which will be delivered on a staged basis from December 2009. These projects are a mixture of new buildings, significant refurbishments and internal upgrades.

The 3D model above shows all major projects. You can download a printable version [PDF, 509kb] of this model.

Master Plan Projects
Project Description Status Timeframes*
Multi-Purpose Sports Hall Underground sports hub at the heart of UTS. First facility to open under the Master Plan
Complete. Opened May 2011

2009 to 2011

Yura Mudang Housing A 720-bed residential tower for UTS students, rising above existing Building 6 Complete. Opened July 2011 2009 to 2011
Great Hall Upgrade Reinvention of UTS's principal ceremonial venue Complete. Opened December 2011
2010-2011
Building 6 Podium Extension New teaching and learning spaces in Building 6, levels 3-7 Complete. Opened March 2012 2011 to 2012
Dr Chau Chak Wing Building New building for the UTS Business School designed by Gehry Partners LLP Site excavation underway - commenced end 2011 2010 to 2014
Broadway Building New 'gateway' building, also known as Information Technology and Engineering Building Construction started March 2012, due to complete end 2013. 2010 to 2014
Thomas Street Building New building Durbach Block Jaggers, in association with BVN Architecture, anounced as winners of the design competition 2011 to 2014
Buildings 1 and 2 Podium Extension Extensions and upgrades Lacoste Stevenson with Daryl Jackson Robin Dyke announced as winners of the design competition under review
Library Retrieval System Underground automate storage and retrieval facility for UTS library collection Site excavation started early 2012 2012 to 2014
Learning Commons Relocated, upgraded UTS library Design competition forthcoming 2013 to 2016
Revitalised Alumni Green New campus heart Pending completion of underground Library Retrieval System building 2014
Buildings 1, 3 and 4 General refurbishment To be advised tba
Building 5 General refurbishment Pending completion of Building 14 2016 to 2018
Building 10 General refurbishment Pending completion of new Broadway Building 2010 to 2014

*NOTE: All project timeframes are indicative only and may vary as Master Plan projects progress.